Changlong's First Dual LNG Loading Skid System Successfully Approved

Time:2016-09-19

Changlong succeeded in developing the world’s first dual loading skid system. On Feb. 02, 2016, the product was officially approved by the European customer, for which we hold a delivery ceremony. 

Based on Generation I and II products, Changlong developed the General III LNG loading skid system as per customer’s requirements and the working environment. The new product has more compact and reasonable structure, better adaptability for working environments, easier operation and better cost performance. Besides, compared with previous product, new product can reduce nearly half investment and workload, and about 35% space. This creative product changes the design concept of the loading skid of single arm, fills the gap of the field. It is the milestone of Changlong’s development, which means Changlong makes a new breakthrough, and takes a solid step towards occupying the commanding heights of the industry. 

In Jun.2015, a R&D team was established in Changlong after receiving customer's requirement for dual loading skid system. The team aimed to innovate a new type loading skid, which could satisfy customer's demand and the special working environment.  Mr. Feng Shigong, General Manager and Chief Engineer in Changlong, leaded the team personally. He is a rich-experienced expert of cryogenic loading industry in China. The R&D team referred to a large number of domestic and foreign literatures, compared the advantages of products in different countries, and combined with the company's previous experience for the design. In the principle of simple structure, easy installation and operation, stable performance, wide adaptability and high cost performance, Changlong invented the new generation product--dual loading skid system after six months' design & modification. 

The new product passed all the inspections and tests carried out by the end user and their appointed third-party inspection authority, Bureau Veritas (BV). It is a complete success, and all test data meet the designed requirements completely. The end user in EU highly appreciated Changlong’s design concept, and satisfied with every performance index. Changlong was awarded a contract for 6 sets of loading skids immediately, with first delivery before Spring Festival of 2016.

 

Mr. Feng Shigong, G. M of Changlong, shaking hands with the owner representatives. 

 

Mr. Feng Shigong, G. M of Changlong, shaking hands with the owner representatives.

 

R&D team took picture with owner representatives.

 

Owner representatives checking the parameters carefully.

 

Owner representatives checking the parameters carefully.

 

Audit by the third-party inspection agency appointed by owner.

 

Audit by the third-party inspection agency appointed by owner.

 

Copy right:Jiangsu Changlong Petrochemical Equipment Co. Ltd.  Powered by PID Interactive